Municipal EV Charging Solutions

Reduce fleet operating costs while meeting sustainability mandates. Our charging solutions integrate seamlessly with your existing municipal operations, delivering reliable infrastructure that supports your fleet’s unique duty cycles.

Municipal Charging Equipment Speak With an expert

Seamless

Reliable

EV Charging

Reliable Charging Infrastructure for Municipalities

Camber Charging delivers turnkey EV charging solutions for municipal fleets nationwide—from Class 8 refuse trucks to light-duty administrative vehicles. We understand public sector electrification requires more than technical expertise: it demands navigating complex procurement, maximizing grant funding, coordinating utility upgrades and load management, and ensuring regulatory compliance. Our municipal clients choose Camber because we reduce risk and deliver proven infrastructure planning that operates reliably in the demanding 24/7 environment of public services.

The Mandate Came. The Expertise Didn’t.

California ACF, federal grant deadlines, city council commitments, and everyone is on a timeline. But nobody is walking you through the nuances of electrifying and utility coordination. At Camber, we handle the complexity. We translate electrical engineering, utility coordination, and grant compliance into working charging infrastructure. 

Your Mandates: 

  • Zero-emission vehicles 
  • Rolling grant applications  
  • Fleet electrified by 2030 
  • Public sustainability goals 

Your Reality:

  • Dated electrical infrastructure 
  • Limited in-house EV expertise 
  • Utility upgrades can take 18+ months 
  • Airport operations

Purpose-Built for Municipal Fleet Diversity

Municipal operations have unique charging needs such as 24/7 emergency response, early-morning collection routes, and unpredictable duty cycles. With Camber Charging our infrastructure is purpose-built for the operational realities of government fleets.

Municipal Fleet Operations

  • Administrative and inspection vehicles
  • Refuse and recycling trucks
  • Sanitation vehicles
  • Social services fleet

Public Works & Utilities

  • Dump trucks and street maintenance
  • Bucket trucks and utility service vehicles
  • Water/wastewater utility trucks
  • Snowplows and street sweepers

Emergency Services

  • Police patrol vehicles
  • Fire support vehicles
  • EMS response vehicles
  • Parking/animal control

Government Facilities

  • Parks maintenance vehicles
  • Campus shuttles
  • Facility maintenance trucks
  • Airport operations

Why Camber for Municipal Fleet Operations

Public sector fleet charging comes with unique challenges that commercial providers don’t address. We’ve built our approach specifically around what municipalities need to succeed.

High Uptime Guarantee

Municipal operations demand reliability, which is why we guarantee 98% uptime for your charging infrastructure. Redundant systems, proactive monitoring, and rapid response ensure your fleet stays operational 24/7.

handshake

Industry Expertise

Our team has delivered dozens of municipal installations and knows how to navigate Buy America, prevailing wage requirements, and the grant compliance that comes with public funding. 

Turnkey Project Management

From site assessment through ongoing operations, we handle utility coordination, permitting, construction, and commissioning. Proactive monitoring and preventive maintenance keep your infrastructure running at peak performance as you scale.

Grant & Funding Support

We identify applicable grants, navigate application requirements, ensure compliance documentation, and maximize your funding stack—making depot charging infrastructure financially viable within your budget constraints.

How We Build Your Charging Infrastructure

Every Camber engagement delivers outcomes you can depend on — from selecting the right equipment to installation and maintenance, we’re with you every step of the way.

01

Select Equipment

The right charger for your vehicle mix and duty cycle. We spec and supply Level 2 and DC fast charging equipment sized for municipal fleets — from light-duty administrative vehicles and police patrol units to Class 8 refuse trucks and heavy-duty public works equipment.

02

Installation & Construction

Turnkey project delivery built around your facility operations and procurement requirements. We handle site assessment, utility coordination, permitting, civil work, and commissioning so your facilities team stays focused on serving the public, not managing a construction project.

03

Charger Management

Real-time visibility into every charger across every municipal facility. Camber Core delivers smart load management, charge scheduling, and reporting built around your fleet’s 24/7 operational demands — so every vehicle is ready when your crews need it.

04

Support & Maintenance

98% uptime backed by proactive monitoring, preventive maintenance, and rapid on-site response. Municipal fleets support emergency services, sanitation routes, and public works operations that can’t pause — our guarantee ensures your infrastructure never becomes the reason service stops.

Municipal Fleet Electrification Resources

Featured Guide:

Grid Utilization and Public Works: Planning for Municipal Depot Charging 

Municipal fleet electrification requires early grid capacity planning and utility coordination—not as an afterthought. Learn how to assess your electrical infrastructure needs, leverage smart energy management, navigate utility upgrades, and build scalable depot charging that grows with your fleet.

Read the Guide

Experience That Delivers

1500

DC Fast Charger
Ports Deployed

36

States and
Provinces

50

GWh of EV
Batteries Charged

60

Million Miles Heavy Duty EVs Travelled

2

Million Hours of Charging Sessions

News You Can Use

Follow the latest in fleet charging.

FAQ

Planning & Feasibility

Assessment depends on vehicle duty cycles, route predictability, depot access to electrical infrastructure, and available capital/grant funding. A fleet feasibility study evaluates these factors and identifies the best candidates for initial electrification.

Capacity requirements depend on fleet size, vehicle types, and charging strategy. A 10-vehicle light-duty fleet might need 200-400 kW, while heavy-duty refuse trucks require significantly more. We conduct load analysis as part of infrastructure planning. 

Absolutely. We design infrastructure with future expansion in mind, ensuring initial installations can scale as you add vehicles without requiring complete system redesigns or costly retrofits. 

Funding & Costs 

Programs include EPA grants, DOT/FTA funding, state clean transportation programs, and utility incentives. Available funding varies by location and fleet type—we help identify and navigate applicable programs for your jurisdiction. 

Upfront costs include equipment, installation, and utility upgrades, but lower fuel and maintenance costs often deliver positive ROI within 5-7 years. Grant funding can cover 50-80% of infrastructure costs in many cases. 

Unmanaged charging can trigger high demand charges from utilities. Our energy management and load management systems optimize charging schedules to minimize demand peaks and reduce monthly utility costs by 30-40%. 

Technical & Operational 

Level 2 charging (typically overnight, 6-8 hours) works well for vehicles with predictable schedules. DC fast charging (30 minutes to 2 hours) suits emergency vehicles, refuse trucks, or fleets needing quick turnarounds between shifts. 

Capacity requirements depend on fleet size, vehicle types, and charging strategy. A 10-vehicle light-duty fleet might need 200-400 kW, while heavy-duty refuse trucks require significantly more. We conduct load analysis as part of infrastructure planning. 

Our 98% uptime guarantee includes redundant systems, 24/7 monitoring, and rapid on-site response. We design infrastructure so single-point failures don’t strand your entire fleet.

Compliance & Procurement

Federal funding often requires that iron, steel, and manufactured products be domestically produced. We ensure equipment selection and procurement documentation meet Buy America compliance for grant-funded projects.

Fleet-Specific Questions

Yes. We design mixed-fleet charging solutions with appropriate power levels for each vehicle class, managed through intelligent load balancing to prevent overloading your electrical service.

Refuse trucks typically require 100-150 kW charging to support daily collection routes (80-120 miles). We analyze route data, vehicle specs, and operational schedules to right-size infrastructure.

Ready to Electrify Your Municipal Fleet?

Turn your electrification goals into operational reality with proven charging solutions and expert support from planning through energization.